Date | Environment |
---|---|
November 29, 2024 (after close of trading) | General Test Environment (“GTE’) |
April 25, 2025 | Production |
Note: The new Periodic Matching model will be implemented in GTE with a Collection Period duration (i.e., duration between Match Events) of 3-5 milliseconds (randomized). Unless advised otherwise by notice, this duration will also apply at production launch date.
Updated documentation has been posted to our website and can be downloaded via the links below. These can also be found on the new Lynx Periodic Matching landing page containing an overview of the new model.
Please direct any questions regarding the new Lynx ATS Periodic Matching model to [email protected].
For technical questions regarding the updated specifications or testing within GTE, please contact
[email protected].